Problem
At the start of this nuclear component engagement we were faced with a number of key issues:
Safety-Critical Parts
The need for full traceability
High-Grade materials needed
Contamination
Exact tolerances
High-level bespoke tooling required
Solution
We did the following to meet and resolve these issues:-
Developed Tooling to meet exacting standards
Sourcing the required high-grade materials
Established a procedure for full traceability - incl. CAST
Designated storage area with controls in place to prevent contamination
Adherence to the Customer Audit process
Specialist training techniques developed
Achieved full ISIR inspection approvals